Achieving a successful installation when it comes to a shower stall is not as difficult as you might think. Given your ability to follow directions and a reasonable amount of construction knowledge, it can be quite rewarding in the end. With quality renovation professionals increasingly delusional and investment sometimes exceeding the budgeted amount, DIY is on the rise.

First, you will need to temporarily turn off the water in the shower unit, don’t worry, once the pipe is plugged, you can turn it back on. Now remove the shower stall as it is now. Depending on whether or not you have a fiberglass unit, cast iron tub, or existing tile post, your demonstration method will differ.

Now that the demo is complete, determine where you want your new shower valves and fittings to go, and discuss them now. Most of the time, when a bathtub has been removed, you will need to install the drain in the center of your new cubicle opening. Also common today are shower niches or soap dishes, the placement and framing of these along with any type of knee or pony wall. “is also done now,

A pre-slope of the slab will now be installed with a castable mud material. Marking the final depth of the new shower stall on the slab or subfloor will give you a stopping point for your pre-slope. ext Install the shower tray liner by attaching it to the drain and lifting it up the wall above your seat height or about 20 inches. Next, form the sidewalk that the shower door will stand at a desirable height, usually 5 inches, with a 2×6 by pulling the tray up between the formwork boards and pouring on each side with concrete encapsulating the tray. .

The installation of duroc material or a concrete-based backing board and taping mesh for the joints will now be done. Once this is done, use a paint or waterproof membrane and cover the entire shower stall except the floor. When it dries packing the floor over the shower tray it is very important to keep at least 1/4 inch for every 3 feet of drop into the drain, this will ensure the water drains properly.

After completing this step, you are ready to begin the installation of the shower floor tile material. Once it is dry, you can begin the installation of the siding. After the tile installation is complete, you will need to clean all tiles and grout lines before grouting begins.

Finally install your new shower door and shower fixtures to start reaping the benefits of your hard work.